| Simfile General Information | ||
|---|---|---|
| Type | Pad | ![]() |
| BPM | 120-239 | |
| Last Activity | 4.2 years ago (2022-03-27 12:42pm) | |
| Last Updated By | SirDj0nt | |
| Simfile File Download | |
|---|---|
| ZIP | ZIP |
| SM | SM (47.68 KiB) 4.2 years ago |
| SSC | SSC (48.66 KiB) 4.2 years ago |
| OGG | OGG (2.52 MiB) 4.2 years ago |
| Banner | Banner (36.51 KiB) 4.2 years ago |
| Background | Background (80.13 KiB) 4.2 years ago |
| Simfile Progress Information | |||
|---|---|---|---|
| Single Beginner | Done - Level 5 | Double Beginner | None |
| Single Basic | Done - Level 11 | Double Basic | None |
| Single Difficult | Done - Level 15 | Double Difficult | None |
| Single Expert | Done - Level 18 | Double Expert | None |
| Single Challenge | Done - Level 19 | Double Challenge | None |
| Single Edit | None | Double Edit | None |
| Audio Quality | Perfect (High Quality) | ||
| Banner Quality | Custom Made | ||
| Background Quality | Custom Made | ||
| Other Information | |
|---|---|
| Comments | *takes a seat* *deep breath in* *deep breath out* *pause* Where do I even begin? So you're probably wondering, A 19?! WHAT ARE YOU THINKING KARL WHY Yep, that's right. Here's the thing. I know my survival past this point is honestly not that likely. I mean, in fact, I figured this might happen, considering that I experiment and that usually results in polarizing files. So...what does Karl do before any possibility of elimination? Hint: look at my Z-I-vision and Summer Contest 2021 files. That's right. If I'm gonna go out, I want to do so with a bang. I want to go all out. If round 4 could be my last, then I better make that file something I can be happy ending my time in Battle Royale with. Hence, a 19. For a song that I can be satisfied with as the end of a trilogy that I have busted myself to bring to you (heck, 'twas the night before I released this file, and sleep? What sleep?). Sure, I have even grander plans for if I somehow survive elimination, but that's a discussion for another time (if it comes). For now, though...it's been a rollercoaster, but I'm really glad that this contest brought out what it brought out of me. Thank you all for playing. No really, from the bottom of my heart, whether you liked or hated my files, I appreciate everything that you guys and this contest for me. To hoping that I get to live another phase... And if not, I'll see you in Summer Contest 2022... 'Til next time, Karl with a K ... ...... ............ ...wait what's that? My emotional story about why I am going out with a 19 is not enough for t7r's simfile comment award? ![]() THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN THIS IS SHIA SAYING YES YOU CAN |
| Views | 499 |
| Downloads | 187 |
| Rating | 10★ (Based on 2 ratings) |
| Rate Simfile | |


